TRANSPORTATION & DISTANCE TO KEY AND ESSENTIAL LOCATIONS
(1) Roads:
Connect directly to National Road No.56
03 km to Bien Hoa - Vung Tau Expressway
04 km to Ring Road 4
13 km to National Road No.51
22 km to Ben Luc - Long Thanh Expressway
44 km from Vung Tau City
75 km from Ho Chi Minh City
(2) Ports:
16 -19 km to Thi Vai - Cai Mep Deep Sea Port
(3) Airports:
54 km to Long Thanh International Airport
INTERNAL TRANSPORTATION SYSTEM
Asphalted road with 30 tons loading capacity.
Center main road North South with 6 lanes, separation 2 meters, width 54 meters.
Branch roads with 2 lanes, width 29 meters.
ELECTRICITY
Facilities: Two transformer stations of 110/22 KV with capacity 2x63 MVA each.
Electricity charge: price offered by Electricity Company of Vietnam for voltage from 22KV to under 110 KV
WATER SUPPLY SYSTEM
Currently, Pure Water Supply Factory is running with capacity of 150,000 m³ / day.
Price according to regulations of Ba Ria – Vung Tau province
WASTED WATER TREATMENT SYSTEM
Building three (03) wastewater treatment plants with estimated capacity of 45,000 cubic meters/day night
Currently wastewater treatment plant is running with capacity of 4,500 m³/day night
Wastewater to be treated: both sanitary and industrial wastewater
According to the State regulations, the volume of wastewater is calculated by 80% of the supplied water volume.