FUNDAMENTAL INFORMATION FOR CHAU DUC URBAN INDUSTRIAL PARK

File name :
FUNDAMENTAL INFORMATION FOR CHAU DUC URBAN INDUSTRIAL PARK

Total area : 2,287 ha

Components:

- Industrial area : 1,556 ha

- Chau Duc Urban Area & Golf Course : 689 ha

- Land outside the Urban Area : 42 ha

PRIORITY FOR TYPICAL INDUSTRIES IN INDUSTRIAL PARK

Electronic components parts, computer and semi-conductors assembling industry;

Production of cables and materials for telecommunication;

Production of Pharmaceutical and Medical products;

Precise mechanics, air conditioners and washing machine manufacturers;

Electrical appliances;

Car accessories, manufacturing and assembling automobiles;

Production of new materials and nanotechnologies;

Silversmithing and jewelry, gemstones, diamond and other precious metals, etc…

Mechanical machining and steel structuring;

Car, motorbike, bicycle, specialized transport assembling industry;

Agro-pharmaceutical, agricultural, food, drinks processing, (excluding tapioca processing);

Construction materials production, construction components (excluding commercial concrete production and concrete structures);

Pret-a-porter, high grade garment and textile, footwear (excluding dying and tanning process);

Plastic products, household appliances;

Wood processing and high-quality wooden furniture.

Etc…

* Industries that are not welcome and restricted in the Industrial Park:

Rubber processing;

Manufacturing basic chemicals (generating industrial wastewater);

Steel refinery from wasted metal in discontinuous furnace technology;

Industries that are priority in the Industrial Park and industries that are not welcome or restricted in the Industrial Park (according to Directive No. 43-CT/TU dated August 6th, 2014 of the Board of Provincial Committee).

SPACE WITH COMPLETED INFRASTRUCTURE

Area with infrastructure:

(Until 08/2020)

1. Rental (*):

Price :1,410,000 VND/ sqm /until 2058

Management fee : 11,750 VND/ sqm /year

(all charges above do not include VAT)

2. Method of payment:

One-time payment for whole leasing life.

Progress of payment is divided into 3 times correlatively with 50%, 30%, 20% within 06 months.

(*) Price subject to change according to current condition

READY BUILT FACTORY FOR LEASE

Ready built factory for lease:

1. Factory A:

Production Factory : 40m x 40m = 1,600 sqm

Office building : 20m x 8m x 2 = 320 sqm

2. Factory B:

Production Factory : 40m x 40m = 1,600 sqm

Office building : 20m x 8m x 2 = 320 sqm

3. Factory C:

Production Factory : 30m x 80m = 2,400 sqm

Office building : 20m x 8m x 2 = 320 sqm

4. Rental & payment method:

Price(*) : 82,250 VND/sqm/month

(Not inclusive VAT; for factory and office area) and increase at maximum 15% after every five years.

Management fee : 11,750 VND/sqm/year

(Not inclusive VAT, for the land area)

Deposit : 06 months’ rental price.

Payment methods: paid quarterly, at the first month of each quarter of year.

Minimum Leasing Period: 05 years.

(*) Price subject to change according to current condition

TRANSPORTATION & DISTANCE TO KEY AND ESSENTIAL LOCATIONS

(1) Roads:

Connect to National Road No.56

13 km from National Road No.51

44 km from Vung Tau City

75 km from Ho Chi Minh City

(2) Ports:

16 -19 km to Thi Vai - Cai Mep Deep Water Port

21 km to Go Dau Port

(3) Airports:

54 km to Long Thanh International Airport

INTERNAL TRANSPORTATION SYSTEM

Asphalted road with 30 tons loading capacity.

Center main road North South with 6 lanes, separation 2 meters, width 54 meters.

Branch roads with 2 lanes, width 29 meters.

LOADING CAPACITY OF THE GROUND

From 1m to 3.5m : 9.31 tons/ sqm

From 3.5m to 6.5m : 16.33 tons/ sqm

From 6.5m - 12m : 31.68 tons/ sqm

ELECTRICITY

Facilities: Two transformer stations of 110/22 KV with capacity 2x63 MVA each.

Electricity charge: price offered by Electricity Company of Vietnam for voltage from 22KV to under 110 KV

WATER SUPPLY SYSTEM

Pure Water Supply Factory with capacity in the first phase is 75,000 m³ / day (actively) and a maximum of about 150,000 m³ / day (in the future).

Price according to regulations of Ba Ria – Vung Tau province

WASTED WATER TREATMENT SYSTEM

Building three (03) wastewater treatment plants with estimated capacity of 45,000 cubic meters/day night

Wastewater to be treated: both sanitary and industrial wastewater

Chargeable volume is counted at 80% of supplied water volume